Malt - O - Meal Plant #3

Project:Malt - O - Meal Plant #3
Tremonton, Utah
Size:526,000 square feet
Completion Date:Currently Under Construction
Construction Cost:$ 85,000,000

Malt - O - Meal Plant #3

Project Description:
This project is divided into separate buildings which consist of a 3-story process packaging plant; two 2-story bin farm and utility buildings; and several single-story accessory buildings. The 3-story plant consists of pre cast columns, wall panels, and hollow-core roof and floor panels. The process / packaging plant features a unique lateral resisting system which includes a central core of lateral resisting elements to allow the building to expand and contract under extreme temperature variations needed for pest control. The warehouse and other out-buildings consist of concrete tilt-up panels with open-web or wide-flange roof joists and structural steel columns.